Dickinson install deck fitting
In the final stages finally,notice the copper coil i added as a heat sink,just waiting for tung oil to dry then final assembly of deck fitting,the diesel drip piping is complete and has been leak tested,metering valve is delivering fuel to burner,only thing left is plumbing to thermostat bypass,but can still light it tonight for test run