Personally, I'd prefer to plan ahead to avoid this situation. Given an adequately sized anchor locker, plan out however much chain (and rope if desired or needed) you'd want or need. Then just add rope to the end of that until you either have a bunch of extra or are approaching the practical capacity of the locker (where chain will still fall in correctly on top of the rope pile).
|