Check with Nordhavn, but for a 52 or 60 the lead time would be 12-18 months. Definitely not 2.5 years, though that's what the build time on my 68 has been. But there was a big backlog. Actual build time for a 68 is about 18 months.


Also keep in mind that the "build time" is to when the boat is finished at the yard. Allow 4-8 weeks shipping, then 2 months commissioning. And longer commissioning if you install the electronics in the US vs pre-installing at the yard.


And Sunchaser is correct about builds that get orphaned before delivery. Shirt happens, and buyers have to drop out from time to time.