View Single Post
Old 09-07-2017, 11:46 AM   #12
Pgitug
Guru
 
Pgitug's Avatar
 
City: Punta Gorda, fl
Vessel Name: Escapade
Vessel Model: Nordic Tug 37 2002
Join Date: Jan 2015
Posts: 1,231
Lines to pilings need to be tied to chains wrap around the piling and dropped to the bottom of the piling on the sea floor. Otherwise the pilings will be pulled over. Leave no slack for storm surge. The tight lines will stretch. Do not leave slack.
Pgitug is offline   Reply With Quote