Our last boat had Lehman SP225s in it. I built a crane in the salon and lifted each engine, 1 per winter, up out of the engine room and stacked it over the other engine to do work in the engine room. It took 3 of us about an hour and a half to actually do the pulling of each engine and about the same when we put them back in. I did not take them out of the salon, that would have been a huge job on that boat since there wasn’t a door from the salon to the side decks.
__________________
Boat Nut:
If you are one there is no explanation necessary.
If you aren’t one, there is no explanation possible.
|