We have a 34' mainship MK I trawler and want to divide the forward chain locker into two parts. Looking for anyone who might have done something like this. Access from the v-berth is somewhat limited and I'm trying to figure out how to get something in there and then have it supported.
Thanks
dosched is offline   Reply With Quote
Old 05-23-2023, 09:19 AM   #2
Guru
 
OldDan1943's Avatar
 
City: Aventura FL
Vessel Name: Kinja
Vessel Model: American Tug 34 #116 2008
Join Date: Oct 2017
Posts: 10,595
Quote:
Originally Posted by dosched View Post
We have a 34' mainship MK I trawler and want to divide the forward chain locker into two parts. Looking for anyone who might have done something like this. Access from the v-berth is somewhat limited and I'm trying to figure out how to get something in there and then have it supported.
Thanks
Do you have a design/plan? Take it to the yard for advice and implementation

I was surprised I could fit into my AT34. Once in, my thought was, ‘okay I’m in now how do I get out.’ LOL
Well, I did the work, maintained my ‘coolness’ and found it easier to get out.
__________________
Two days out the hospital after a week in the hospital because of a significant heart attack.
OldDan1943 is offline   Reply With Quote
Old 05-24-2023, 07:28 AM   #3
Guru
 
City: Olympia
Vessel Name: Rendezvous
Vessel Model: Blue water 40
Join Date: Aug 2021
Posts: 1,815
My locker is divided into two sections. I’ve got 400 feet of chain in one side and 400 feet of rope in the other.
I didn’t do this, it came to me this way. Someone had put small eye screws (lots of them) where the wall would be, then laced it with twine. Works great, and you can see through it. Breathes well too.
Bmarler is offline   Reply With Quote
Old 05-24-2023, 08:57 AM   #4
Veteran Member
 
City: Stuart, FL
Join Date: Oct 2018
Posts: 27
screws

So up forward along the bow, they were screwed into the hull? I can see screwing them up and down along the bulkhead.
Thanks
dosched is offline   Reply With Quote
Old 05-24-2023, 10:05 AM   #5
Guru
 
C lectric's Avatar
 
City: Gibsons, B.C., Canada
Vessel Name: Island Pride
Vessel Model: Palmer 32'
Join Date: Oct 2007
Posts: 4,414
So epoxy some 3/4" ply pieces to form anchor points along the ID of the hull curve.
Different application but I do that when running electrical cables although I use Sikaflex 291. Couple hours and it has set up enough to hold my ply bits.
C lectric is offline   Reply With Quote
Old 05-24-2023, 10:10 AM   #6
Guru
 
City: Olympia
Vessel Name: Rendezvous
Vessel Model: Blue water 40
Join Date: Aug 2021
Posts: 1,815
Quote:
Originally Posted by dosched View Post
So up forward along the bow, they were screwed into the hull? I can see screwing them up and down along the bulkhead.
Thanks
Just like c electric said, glue a piece of wood to the hull side where needed.
Bmarler is offline   Reply With Quote
Old 05-24-2023, 10:19 AM   #7
Guru
 
Marco Flamingo's Avatar
 
City: Dewatto
Vessel Name: CHiTON
Vessel Model: Tung Hwa Clipper 30
Join Date: Jan 2020
Posts: 1,096
My chain locker is designed so that it drains into the bilge. A really bad design given the amount of sand and mud that usually comes up with the anchor rode. A long deck brush helps. We can squirt it with our precious fresh water. The real solution is a chain locker with a substantial overboard drain (probably 1 inch). Instead of spraying the chain as it comes up, I could spray it when piled in the locker. I might still have to spend an hour to clean it out once a year, but it would save me 20 minutes every time I pull anchor.
__________________
Marco Flamingo
Marco Flamingo is offline   Reply With Quote
Old 05-24-2023, 10:52 AM   #8
Moderator Emeritus
 
Comodave's Avatar
 
City: Au Gres, MI
Vessel Name: Black Dog
Vessel Model: Formula 41PC
Join Date: Jul 2015
Posts: 21,189
On a previous boat the bottom of the rope locker was below the waterline so it just drained into the bilge. I glassed a false bottom in and slanted it to one side. Drilled drain hole on that side. Worked great.

On our last boat the rope locker was huge and deep. I wanted a second rode so I glassed in a vertical divider. Made it out of plywood and glassed it in with strips of 1708 and thickened epoxy to make a fillet after coating the plywood with epoxy.
__________________
Boat Nut:
If you are one there is no explanation necessary.
If you aren’t one, there is no explanation possible.
Comodave is online now   Reply With Quote
Old 05-24-2023, 11:41 AM   #9
Senior Member
 
City: Fayetteville, NC
Vessel Name: Dirty Deeds
Vessel Model: Maritimo 48
Join Date: Jun 2015
Posts: 331
Quote:
Originally Posted by Marco Flamingo View Post
My chain locker is designed so that it drains into the bilge. A really bad design given the amount of sand and mud that usually comes up with the anchor rode. A long deck brush helps. We can squirt it with our precious fresh water. The real solution is a chain locker with a substantial overboard drain (probably 1 inch). Instead of spraying the chain as it comes up, I could spray it when piled in the locker. I might still have to spend an hour to clean it out once a year, but it would save me 20 minutes every time I pull anchor.
I think the real solution is a strong raw water washdown pump along with an overboard drain. You can wash the mud off with the raw water as the chain comes up, and later rinse the chain pile with freshwater.

You can't remove mud once the chain is in the locker.
ABfish is offline   Reply With Quote
Old 05-27-2023, 02:03 PM   #10
Veteran Member
 
City: KENNEBUNKPORT
Vessel Name: Clairrann
Vessel Model: Grand Banks 36
Join Date: May 2019
Posts: 38
I divided the rope locker on my GB36. I made a simple cardboard template & used it to cut a piece of 1/2” plywood to shape. I could not get the single piece through the locker door so I cut it in half; a fore/aft cut not top/bottom cut. Two pieces were much easier to handle. I then tabbed the pieces into place with some epoxy & ‘glad cloth. I just used what I had on hand. It may not have been the finest of workmanship but it was more than adequate. I was stowed 150’ of chain on one side w/room for more and 25’ of chain & 200’ of 5/8” anchor line in the other side. It was a fairly simple job although it was a bit awkward working thru the small locker door. It was probably 15 yrs ago so my memory is not perfect but I think I did it in two sessions. And I drilled 2 holes in the bottom section & fed the bitter end of each anchor line and knotted w/stopper not so as it to Lise the line it it started to run out. My current boat has a larger rope licker but a smaller door but I’ll be doing the same thing again as I like to keep two sets of ground tackle on the bow - a Manson & a Fortress.
Scrib is offline   Reply With Quote
Old 05-27-2023, 02:49 PM   #11
Veteran Member
 
City: Stuart, FL
Join Date: Oct 2018
Posts: 27
anchor locker

Thank you for the reply and good luck doing it all over again!
dosched is offline   Reply With Quote
Reply

Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


» Trawler Port Captains
Port Captains are TF volunteers who can serve as local guides or assist with local arrangements and information. Search below to locate Port Captains near your destination. To learn more about this program read here: TF Port Captain Program





All times are GMT -5. The time now is 08:45 PM.


Powered by vBulletin® Version 3.8.8 Beta 4
Copyright ©2000 - 2024, vBulletin Solutions, Inc.
Search Engine Optimization by vBSEO 3.6.0
Copyright 2006 - 2012