Reply
 
Thread Tools Search this Thread Display Modes
 
Old 06-13-2022, 08:03 AM   #1
fdw
Member
 
City: Abingdon, Virginia
Join Date: Dec 2015
Posts: 22
GB 36 Bridge Deck Removal

Re 1977 GB 36 bridge deck removal (for over-the-road transport): I think I remember reading somewhere that GB built the early 36s with easy bridge deck removal in mind. Does anyone have details? Thanks.
fdw is offline   Reply With Quote
Old 06-13-2022, 10:03 AM   #2
Guru
 
Giggitoni's Avatar
 
City: Vallejo, California
Vessel Name: Mahalo Moi
Vessel Model: 1986 Grand Banks 42 Classic
Join Date: Jun 2008
Posts: 2,081
I’ve read it’s very involved. I’ve also read the task should be hired out and the same person hired to reassemble at the new location. Have you considered selling your GB and purchasing another GB at the new location? All things considered, it could be cheaper.

I’ve attached a screen shot from my GB42 manual.
Attached Thumbnails
2B3792B2-8AE5-49E3-898D-E7831B8AF4A3.jpg  
__________________
Ray
"Mahalo Moi"
1986 GB-42 Classic
ΜΟΛΩΝ ΛΑβΕ
Giggitoni is offline   Reply With Quote
Old 06-13-2022, 12:00 PM   #3
Guru
 
Cigatoo's Avatar
 
City: Narragansett Bay
Vessel Model: Grand Banks 36
Join Date: Sep 2016
Posts: 1,742
Removing the bridge and going over the road would be my absolute last resort to move my 36. Do you want to elaborate on your intentions? If I were going to the opposite coast I would sell and purchase another boat before going over the road. However I will check my manual on the boat and see what I can find for you.
__________________
Carl
Cigatoo is offline   Reply With Quote
Old 06-13-2022, 12:18 PM   #4
Guru
 
Giggitoni's Avatar
 
City: Vallejo, California
Vessel Name: Mahalo Moi
Vessel Model: 1986 Grand Banks 42 Classic
Join Date: Jun 2008
Posts: 2,081
Another thought. If you’re moving your boat to another location on the same coast, the cost may be cheaper to hire a captain to move the boat.
__________________
Ray
"Mahalo Moi"
1986 GB-42 Classic
ΜΟΛΩΝ ΛΑβΕ
Giggitoni is offline   Reply With Quote
Old 06-13-2022, 12:45 PM   #5
Moderator Emeritus
 
Comodave's Avatar
 
City: Au Gres, MI
Vessel Name: Black Dog
Vessel Model: Formula 41PC
Join Date: Jul 2015
Posts: 19,142
Not familiar with the GB flybridge removal but it can be anything from easy to horrible depending on how it is built. Be absolutely careful on labeling everything that is unhooked and take a bunch of photos of everything. It is very easy to forget how it came apart. And be prepared for new leaks. A friend had his bridge removed on a Californian and he said it took him 2 years to fix all the leaks and electrical problems that cropped up after the move.
__________________
Boat Nut:
If you are one there is no explanation necessary.
If you aren’t one, there is no explanation possible.
Comodave is offline   Reply With Quote
Old 06-13-2022, 01:20 PM   #6
Newbie
 
City: CROWNSVILLE
Vessel Name: Ploiarion
Vessel Model: Bristol Corsair
Join Date: Oct 2018
Posts: 4
Hi

There's a gentleman in my neighborhood selling a 1976 GB42 with good engines and generator; the $37,500 reflects rotten woodwork in the cabin and flybridge sole, and teak decks in general. My question is, can you remove the whole cabin and decks just as easily as the flybridge?
Brendan
brendanwalls is offline   Reply With Quote
Old 06-13-2022, 02:19 PM   #7
Senior Member
 
Xlantic's Avatar
 
City: Mahón, Menorca
Vessel Name: Halcyon
Vessel Model: 1973 Grand Banks 50
Join Date: Mar 2015
Posts: 462
When I sold my 1979 GB 42 the new owner removed the flying bridge for trucking to England:
Attached Thumbnails
DSC_0273 (1).jpg   DSC_0272 (2).jpg  
__________________
Gilberto
Xlantic is offline   Reply With Quote
Old 06-14-2022, 07:37 PM   #8
fdw
Member
 
City: Abingdon, Virginia
Join Date: Dec 2015
Posts: 22
GB 36 Bridge Deck Removal

Many thanks for your responses.

Cigatoo, any luck finding info in your manual? Dave
fdw is offline   Reply With Quote
Old 06-19-2022, 01:15 AM   #9
Senior Member
 
City: Phoenix
Vessel Name: Interim
Vessel Model: Grand Banks 36
Join Date: Jan 2015
Posts: 148
Years ago we purchased a GB 36 in Wisconsin and had it trucked to Seattle Washington and did not have to remove the fly bridge. It made the trip just fine except for some road dirt.
Gbinterim is offline   Reply With Quote
Old 06-19-2022, 07:06 AM   #10
fdw
Member
 
City: Abingdon, Virginia
Join Date: Dec 2015
Posts: 22
GB 36 Bridge Deck Removal

Thanks Gbinterim, that's encouraging. Do you have any other information...picture, name of trucking company, anything?
fdw is offline   Reply With Quote
Old 06-19-2022, 07:57 AM   #11
Guru
 
mvweebles's Avatar
 
City: Saint Petersburg
Vessel Name: Weebles
Vessel Model: 1970 Willard 36 Trawler
Join Date: Mar 2019
Posts: 5,961
You may want to reach out to Joule Transport out of Clearwater FL. While few truckers have good online reviews, they have less-bad than others (at least when I looked a few years ago). They have specially designed trailers for boats and can tip the boat forward (similar to how the GB42 in one of the pics up-thread). With removal of venturi screen, there's a decent chance you will be below the 13'6" magic number for trucking. Given the number of GB36 boats out there, they may have direct knowledge.

Good luck

Peter
__________________
M/V Weebles
1970 Willard 36 Sedan Trawler
mvweebles is online now   Reply With Quote
Old 06-24-2022, 08:45 PM   #12
Member
 
City: Clinton, WA
Vessel Name: Pea Pod
Vessel Model: 1987 36 Grand Banks Classic
Join Date: Oct 2015
Posts: 5
GB 36 FB removal

9 years ago, we transported our 36 GB Classic from New York to Washington state. Fly bridge removal was required. It is not a task for the faint of heart as it requires many man hours and patience. I spent 10 days preparing the boat for transport and another to rebuild 10 days upon reaching destination. Distance covered, 4000 miles, total project cost $27000.00, including $18000 trucking fee. For me the cost was justified because I could not locate one for sale closer to home. I do not regret it, but would never do it again. Long distance overland transport is hard on a boat.
bill.read is offline   Reply With Quote
Old 06-25-2022, 10:20 AM   #13
fdw
Member
 
City: Abingdon, Virginia
Join Date: Dec 2015
Posts: 22
GB 36 Bridge Deck Removal

Thanks all, and note that I also posted on the Grand Banks FaceBook page.

Most everyone reported lots of negatives and challenges removing the bridge deck, but also reported removal was necessary for trucking. However, one FB picture showed a GB 36 going over-the-road with bridge deck intact with a reported height of 4.2 meters (13' 10').

Several trucking companies ignored my inquiries. The only quote I received was for $22.50 per loaded mile. Compare that to the cost of $4.50 ($18,000 for 4,000 miles) per loaded mile nine years ago.

Go figure...!
fdw is offline   Reply With Quote
Old 06-25-2022, 11:26 AM   #14
Guru
 
rgano's Avatar
 
City: Southport, FL near Panama City
Vessel Name: FROLIC
Vessel Model: Mainship 30 Pilot II since 2015. GB-42 1986-2015. Former Unlimited Tonnage Master
Join Date: Oct 2007
Posts: 4,703
I trucked my GB42 from San Diego to Galveston in 1990 with the flying bridge intact for $9800. The trucking company was out of Pasadena ,TX but no longer in business. The rate would have doubled east of the Mississippi to get it to Jacksonville, FL; so, I went by water from Galveston and just stopped permanently in Panama City. Still here - different boat now.
__________________
Rich Gano
FROLIC (2005 MainShip 30 Pilot II)
Panama City area
rgano is offline   Reply With Quote
Old 06-25-2022, 03:13 PM   #15
Moderator Emeritus
 
Comodave's Avatar
 
City: Au Gres, MI
Vessel Name: Black Dog
Vessel Model: Formula 41PC
Join Date: Jul 2015
Posts: 19,142
Where were you going to move it to and where from?
__________________
Boat Nut:
If you are one there is no explanation necessary.
If you aren’t one, there is no explanation possible.
Comodave is offline   Reply With Quote
Old 06-25-2022, 06:58 PM   #16
fdw
Member
 
City: Abingdon, Virginia
Join Date: Dec 2015
Posts: 22
GB 36 Bridge Deck Removal

My home area marinas are in the Knoxville area on the Tennessee River (just upstream from Chattanooga).

I am comparing the cost/time/aggravation of moving a GB 36 via land vs. water from Savannah to Chattanooga. It's only 375 Interstate miles, but 1,750 water miles around Florida et. al. I project the relocation would take a couple of days by Interstate, and a couple of months by water.

If only I had the time.....
fdw is offline   Reply With Quote
Old 06-25-2022, 09:45 PM   #17
Moderator Emeritus
 
Comodave's Avatar
 
City: Au Gres, MI
Vessel Name: Black Dog
Vessel Model: Formula 41PC
Join Date: Jul 2015
Posts: 19,142
Trucking, one would think, makes sense. But taking the bridge off can be a big can of worms. Good luck with which every way you go.
__________________
Boat Nut:
If you are one there is no explanation necessary.
If you aren’t one, there is no explanation possible.
Comodave is offline   Reply With Quote
Old 09-26-2022, 10:09 PM   #18
Veteran Member
 
Hyperion's Avatar
 
City: Miami
Vessel Name: Hyperion
Vessel Model: Grand Banks Heritage Classic 42
Join Date: Sep 2022
Posts: 89
Quote:
Originally Posted by fdw View Post
My home area marinas are in the Knoxville area on the Tennessee River (just upstream from Chattanooga).

I am comparing the cost/time/aggravation of moving a GB 36 via land vs. water from Savannah to Chattanooga. It's only 375 Interstate miles, but 1,750 water miles around Florida et. al. I project the relocation would take a couple of days by Interstate, and a couple of months by water.

If only I had the time.....
As someone who did the loop on my 36, I strongly recommend you do it yourself or hire a captain instead of ripping off the bridge and trucking it. It would be a great trip and you can do it in a month.
Hyperion is offline   Reply With Quote
Old 09-27-2022, 04:07 PM   #19
Senior Member
 
Steve1.0's Avatar
 
City: Hobe Sound
Vessel Name: Kumatage
Vessel Model: Grnd Bnks 46 cl
Join Date: Aug 2020
Posts: 192
Quote:
Originally Posted by fdw View Post
My home area marinas are in the Knoxville area on the Tennessee River (just upstream from Chattanooga).
I project the relocation would take a couple of days by Interstate, and a couple of months by water.

If only I had the time.....

Going by water doesn't have to be done in one shot either. Leave the boat where ever you need to stop, and resume the trip when the pesky job doesn't interfere.
Steve1.0 is offline   Reply With Quote
Reply

Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


» Trawler Port Captains
Port Captains are TF volunteers who can serve as local guides or assist with local arrangements and information. Search below to locate Port Captains near your destination. To learn more about this program read here: TF Port Captain Program





All times are GMT -5. The time now is 11:51 AM.


Powered by vBulletin® Version 3.8.8 Beta 4
Copyright ©2000 - 2023, vBulletin Solutions, Inc.
Search Engine Optimization by vBSEO 3.6.0
Copyright 2006 - 2012