Trawler Forum

Trawler Forum (https://www.trawlerforum.com/forums/)
-   Custom Builds & Refit Projects (https://www.trawlerforum.com/forums/s25/)
-   -   Teak pilot house doors (https://www.trawlerforum.com/forums/s25/teak-pilot-house-doors-13569.html)

Pack Mule 02-02-2014 12:49 PM

Teak pilot house doors
 
2 Attachment(s)
Doors are starting to come together.

FlyWright 02-02-2014 02:07 PM

That's very inspiring! Mine are in desperate need of help but lack an owner with your level of woodworking skills.

Very nice!

Pack Mule 02-03-2014 05:53 AM

When I took the old doors off that plywood covered with fiberglass the plywood core was rotted around they windows and at the bottom.I kept looking at the doors and I thought they were built slightly out of square. .They were actually a 2 degree parallelogram.It was so slight that I almost built the doors square and they would not have worked .Man that would have been a huge and costly mistake .
I wish I was faster at woodworking . I know guys that can just blow through this kind of woodworking and never think twice. I have a tendency to over think and then can't decide how I want to go about building something. Cabinet and furniture making is not like the woodworking on any boat .The biggest challenge for me has been making the end result look like it's made for a boat and not a house.It doesn't always work but it is getting better.
This entire project has just about wooped my wife and I and we still have a good ways to go. I could not do this without her help and support.
Now it's the anchor platform I have to work out .

ksanders 02-03-2014 09:34 AM

Now, those look nice!

Once on the boat they will be most impressive!

Xsbank 02-06-2014 02:24 AM

Very nice work. If building boats was easy we'd all be doing it!

Hendo78 03-22-2014 11:43 AM

Quote:

Originally Posted by Xsbank (Post 211227)
If building boats was easy we'd all be doing it!

Lol how true!

Sent from iPad using Trawler App

Pack Mule 04-13-2014 08:07 AM

1 Attachment(s)
Caulking teak door panels with TDS SIS 440 .

Pack Mule 04-13-2014 08:09 AM

1 Attachment(s)
After pulling tape off .

mbevins 04-13-2014 08:45 AM

Quick question.
If I use a varnish remover,will it damage that caulk you used?
(Sorry for the hijack)

Sent from my Nexus 7 using Trawler

Pack Mule 04-13-2014 08:55 AM

Quote:

Originally Posted by mbevins (Post 226737)
Quick question.
If I use a varnish remover,will it damage that caulk you used?
(Sorry for the hijack)

Sent from my Nexus 7 using Trawler

I bet it would .It cleans up pretty easy with just regular paint thinner . The guys at Teak Decking Systems are great . They will answer any questions you have .

healhustler 04-13-2014 09:11 AM

I had a heck of a time with that caulking. Ya gotta tape each seam and really put it down good. Unlike yours, my caulking seemed to stain the teak right away, and I had to use another product to finish it out. Looks great, by the way.

mbevins 04-13-2014 09:19 AM

Quote:

Originally Posted by Pack Mule (Post 226744)
I bet it would .It cleans up pretty easy with just regular paint thinner . The guys at Teak Decking Systems are great . They will answer any questions you have .

Thanks, I'll give them a call. I need strip the inserts in my swim platform.

Sent from my Nexus 7 using Trawler

Pack Mule 04-13-2014 09:41 AM

Quote:

Originally Posted by healhustler (Post 226749)
I had a heck of a time with that caulking. Ya gotta tape each seam and really put it down good. Unlike yours, my caulking seemed to stain the teak right away, and I had to use another product to finish it out. Looks great, by the way.

Yeah Larry it wasn't as forgiving on my rail joints because the teak didn't have any finish on it . But it does clean up pretty good with just regular paint thinner but you have to scrub to get it out of the grain.I used a flexable putty knife instead of a hard knife and it seamed to work better. Caulking is just a pain no matter what you use. But taping it off and letting the end of the tape run wild so you have something to grab hold of when you pull it off is a big help . That way you don't have to use your finger nail to get tape started .

Forkliftt 04-14-2014 07:18 PM

Stunning!


1983 Present 42 Sundeck
Lehman 135 Twins

Pack Mule 04-14-2014 08:38 PM

Thanks Forkliftt,I hope to get these doors put together and mounted within a week or so .

Forkliftt 04-15-2014 05:05 AM

I look forward to seeing them installed.


1983 Present 42 Sundeck
Lehman 135 Twins

Hendo78 04-15-2014 06:45 AM

Quote:

Originally Posted by Forkliftt (Post 227132)
I look forward to seeing them installed.


1983 Present 42 Sundeck
Lehman 135 Twins


X 2


Sent from my iPad using Trawler Forum

Pack Mule 04-15-2014 07:49 AM

Yeah the old doors were hung and not very well . I made new tracks and the doors will hopefully slide in the bottom track and not hang up .I used uhmw in the track on the bottom . I mounted the tracks on a basement wall and the door frames slide pretty good but that was without the doors panels and on a wall not a cabin side.The doors will be at least twice as heavy as just the frames once I add the panels and the ports .I have a lot of adjustment built into the tracks.:ermm:

Pack Mule 04-27-2014 03:34 PM

1 Attachment(s)
Port door mounted .

Pack Mule 04-27-2014 03:39 PM

1 Attachment(s)
Inside pic . Still need to install cowling around door on the outside .


All times are GMT -5. The time now is 02:28 PM.

Powered by vBulletin® Version 3.8.8 Beta 4
Copyright ©2000 - 2021, vBulletin Solutions, Inc.
Search Engine Optimization by vBSEO 3.6.0
Copyright 2006 - 2012