Search results

The friendliest place on the web for anyone who enjoys boating.
If you have answers, please help by responding to the unanswered posts.
  1. swordfish

    improving and maintaining Albin 33

    Thanx you all..
  2. swordfish

    improving and maintaining Albin 33

    well..... :-) i see it more like an adventure and a hobby. for the most part i can get my parts and materials for cheap and sometimes free. occacionaly i have to buy some machines like welders and such, wich i earn back by doing small work for others. Yes it cost allot of money but this way i...
  3. swordfish

    improving and maintaining Albin 33

    To keep the mast upright, i use 2 stainless pipes 22mm pointing to the front instead of 4 rigging wires. Nice, sturdy, clean look
  4. swordfish

    improving and maintaining Albin 33

    The need for a quick foldable mast in the netherlands is a must ;-) I think we can call this a 2 inch gap..? (5 cm)
  5. swordfish

    improving and maintaining Albin 33

    .
  6. swordfish

    improving and maintaining Albin 33

    Found some photos from last year. I made a new stainless mastfoot and mast. Cant find photos of the complete project. I will post them later. For the old mast to fold down, fist i had to fold down the bimini to the front, fold the mast foreward and then the bimini to the aft. This setup both...
  7. swordfish

    improving and maintaining Albin 33

    Hatch in the aft cabin is installed
  8. swordfish

    improving and maintaining Albin 33

    Some more scrap materials where found, hahaha And made somthing usefull out of it
  9. swordfish

    improving and maintaining Albin 33

    Some scrap material where found, some aditional projects where born. And 2 flagpoles where made
  10. swordfish

    improving and maintaining Albin 33

    By lack of a correct size bending tool i did some improvising again. Turned out quit well in the first try
  11. swordfish

    improving and maintaining Albin 33

    Its not allowed to weld metal in the hangar. so a temporary welding tent is set up. The stainless is marked and then tackwelded outside in the tent. Then its taken back inside for fitting. After all was good and aligned the railing is taken to my wordshop just around the corner for a complete...
  12. swordfish

    improving and maintaining Albin 33

    A discision is made to replace the old teak hand railings. I have used the old one as a bending mold. This way i could coldbent the new stainless in the correct radius
  13. swordfish

    improving and maintaining Albin 33

    A new front cabin hatch is installed. Like the new hatch in the aft cabin, this one is also customized with a solar fan
  14. swordfish

    improving and maintaining Albin 33

    Also a new stainless samson post is made. Is slides over the old one en is fixed with glue en screws
  15. swordfish

    improving and maintaining Albin 33

    The peaces are welded and sand down. After that, a woodgrain is made, to make it look like teak
  16. swordfish

    improving and maintaining Albin 33

    Unfortunate the caprail was rotten in a few places so it was removed and will be replaced with pvc woodlook
  17. swordfish

    improving and maintaining Albin 33

    After I renovated the deck hatch in the aft cabin in 2017, I continue to find it annoying to maintain the woodwork. Because I am making the entire boat low-maintenance, the roof hatch is also due. This summer I bought another deck hatch with an aluminum frame and plexiglass. I covered this with...
  18. swordfish

    improving and maintaining Albin 33

    update. After enjoying the ship for a while, I completely forgot to give updates on the progress of the work. The swordfish is back on dry land this winter and I am working hard again to make it beautiful. first i will show the past projects in finished condition, and subsequently this year's...
  19. swordfish

    improving and maintaining Albin 33

    and some more fueltanks in the making at the workshop
  20. swordfish

    improving and maintaining Albin 33

    And of course I'm busy with painting and varnishing
  21. swordfish

    improving and maintaining Albin 33

    in the end I got even more faux teak. i replaced various decorative edges on the front cabin and aft cabin and flybridge
  22. swordfish

    improving and maintaining Albin 33

    I also made a new ladder and railing to get to the aft deck. here at the wharf they they are joking and say I'm making my boat wheelchair friendly. bending the stainless steel for the first time did not go well, I needed a little more practice. but in the end i got it right. I have welded the...
  23. swordfish

    improving and maintaining Albin 33

    to all. again my apologies. it seems I've gotten pretty good at building a boat but I can't seem to get it right to post a picture well oriented.
  24. swordfish

    improving and maintaining Albin 33

    also made a new faux teak deck for the aft cabin
  25. swordfish

    improving and maintaining Albin 33

    in the meantime I started a repair on the flybridge deck. I noticed a soft spot had formed and the easiest way to fix it was through the bottom, i.e. through the salon roof. first I had removed a piece from the starboard aft ceiling to get to the soft spot. cut away a piece of polyester to get...
Back
Top Bottom