Our Journey- new North Pacific 45

The friendliest place on the web for anyone who enjoys boating.
If you have answers, please help by responding to the unanswered posts.

godfather

Veteran Member
Joined
Nov 24, 2014
Messages
27
So I started this thread in the Welcome Mat forum and thought it would be more appropriate in this General Discussion Forum. If you want to see the first 4 pictures please go that forum same title. Since this will be a "long" over time thread(Delivery not until "Decemberish" I wanted to switch to this one. :)

In the first picture I am showing the rough build-out of the galley and showing is the large space for a full size stand-up refrig/freezer with built in ice maker.

The second picture shows an area in the salon which is directly across the area with the settee.

The third picture shows the steps up to the pilothouse.
 

Attachments

  • DSC_2940.jpg
    DSC_2940.jpg
    99.5 KB · Views: 153
  • DSC_2941.jpg
    DSC_2941.jpg
    112.1 KB · Views: 168
  • DSC_2943.jpg
    DSC_2943.jpg
    92.4 KB · Views: 181
So there's no concern about damage to the floor? I would have thought it be covered.
 
So there's no concern about damage to the floor? I would have thought it be covered.

Indeed I would have thought that it would be the last thing coming in not to damage it.

L.
 
Indeed I would have thought that it would be the last thing coming in not to damage it.



L.



Not sure how they do it. Every NP I've seen has beautiful flooring throughout so it must work well.
 
How exciting.
Just goes to show you how durable this type of flooring is. Must have to have it down for cabinet fit.
Will be fun to see the build out process.
Be sure and get some pictures of the engine room.
 
Good observation on the flooring-the floors are covered at every stage except this one. They are varnishing the whole boat including the floors and sanding each coat before the next goes on. No one goes in there without protection over their shoes and there is no heavy equipment in there right now to damage anything. These are the build up coats of varnish to get a nice smooth/deep finish. For the final coat all the dust will be cleaned and windows covered in plastic. Hope this helps:)

Here is a picture of the work in progress of the helm station in the pilothouse.
 

Attachments

  • DSC_2944.jpg
    DSC_2944.jpg
    74.9 KB · Views: 108
pictures of the work in progress on the master suite and the guest stateroom.
This guest stateroom has double berth on the bottom and a single bunk on top. we could fit three in there in a pinch ! The master shows how much walk around space there is.
 

Attachments

  • DSC_2949.jpg
    DSC_2949.jpg
    79.6 KB · Views: 87
  • DSC_2947.jpg
    DSC_2947.jpg
    73.8 KB · Views: 97
Looking good Godfather. Thanks for sharing the pictures. This boat recently popped up on our short list. PM sent.
 

Latest posts

Back
Top Bottom