View Single Post
Old 06-28-2017, 04:47 PM   #729
ben2go
Guru
 
ben2go's Avatar
 
City: Upstate,SC
Country: USA
Join Date: May 2012
Posts: 1,370
Quote:
Originally Posted by She-Kon View Post
Frame A and D now tabbed to the hull. I ran out of glue (epoxy & wood flour w/little cabosil) so ordered more. I hope to drop Frame F in tomorrow. That's the front part of the main cabin. Will have to build stairs over the engine space and down into the forward cabin. Engine should be finished soon.


Standby.....
Making head way.
__________________


ben2go is offline   Reply With Quote