Forkliftt
Guru
- Joined
- Oct 6, 2007
- Messages
- 2,450
- Location
- USA
- Vessel Name
- KnotDoneYet
- Vessel Make
- 1983 42' Present Sundeck
Here's a project I have been pondering for a while. I went to Lowes and purchased a 1 1/4" x 4' galvanized pipe, 2- caps for this pipe, 1/2 x 10 galvanized lag screws, a 12" x 3/8" (would have preferred 5/16") drill pit to pre drill the two holes in the piling, 4- 5/8" galvanized nuts and 6- 1/2" galvanized flat washers. At the boat I drilled a 1/2" hole near each end, did my best attempt at braiding a 3 strand 5/8" line onto a ring I had purchased a while back, I drilled a 1/8" hole in the lower cap to allow drainage- followed by assembly. Works great. ~ $50-
1983 Present 42 Sundeck
Twin Lehman 135's
1983 Present 42 Sundeck
Twin Lehman 135's