The Eagle had a leak be hind shaft log where the log connects to the shaft tube. Had to pull the boat, pull back the shaft, take out the log, cut out the punk wet wood, fill with area with epoxy, install a new SS backing plate, reinstall the shaft log. Took about two weeks most of the time was drying time. Cost 2 to 3 grand.
|