Rogerh
Guru
- Joined
- Aug 27, 2013
- Messages
- 724
- Location
- USA
- Vessel Name
- At Last
- Vessel Make
- 1990 Jefferson 52 Marquessa
Our head is below the water line but above the holding tank. Presently head output is routed to vented loop which is installed above the water line, then to the 2 way valve (above water line) and then either to the thru hull or to the holding tank. I am replacing all the hoses. Can I go the 2 way valve first (below water line) and then to either the vented loop (above water line) or to the holding tank? This way if I am going to the holding tank I dont have to pump the stuff up hill, just through the 2 way valve and down to the holding tank. Am I missing something or will this be OK. Thanks....