Old 05-29-2019, 03:41 PM   #1
Guru
 
syjos's Avatar
 
City: Gig Harbor
Country: USA
Vessel Name: Sandpiper
Vessel Model: Bluewater 40 Pilothouse Trawler
Join Date: Nov 2012
Posts: 725
Bluewater 40 Pilothouse Roof Replacement

Here are pictures from my roof replacement project on a Bluewater 40 Pilothouse Trawler.

The roof was glass cloth set in polyester resin over mahogany plywood from the factory. The trim around the edges of the roof was made of solid mahogany, spliced together with butt joints. Water got into the roof and caused delamination of the glass cloth. Water in the trim caused constant cracking of the glass cloth.

The bad roof was pointed out by Matt Harris in the pre purchase survey in 2000 and the purchase price was adjusted to cover the repair. There were more urgent projects to tackle first so I've been patching it for around 18 years and the whole roof was pretty much one large patch.

Started the project in the fall of 2017, took a break during the summer of 2018 to go cruising, restarted the project in the fall of 2018 and am currently finishing it.

Old roof off. It was pretty simple removing the roof. The old roof was fastened with boat nails (ring shank) and no glue. Cut alongside beams to remove most of the roof and pried off the rest nailed to the beams. Left the radar mount in place since I had rebuilt that area years ago when the second radar was installed. Those roof beams are very springy without the plywood holding them in place so will need to add a temporary frame at midpoint.
Attached Thumbnails
Click image for larger version

Name:	1.jpg
Views:	73
Size:	74.9 KB
ID:	89448  
__________________
Advertisement

syjos is online now   Reply With Quote
Old 05-29-2019, 03:47 PM   #2
Guru
 
syjos's Avatar
 
City: Gig Harbor
Country: USA
Vessel Name: Sandpiper
Vessel Model: Bluewater 40 Pilothouse Trawler
Join Date: Nov 2012
Posts: 725
Pic 1 Gluing down scarfed 1/2" mahogany marine plywood panels. Temporary frame at midpoint of the pilothouse to keep roof beams at the proper orientation. The long plywood was hinged at the left side in order to locate them at the correct position so the adhesive did not smear while installing without assistance. The plywood was held down with temporary screws with fender washers into the beams. Screws removed after adhesive cured. Plastic on the boathouse roof to prevent condensation from dripping on bare plywood. Using System Three Gel Magic for the first time. Loaded the mixed Gel Magic into a caulking tube and applied it to the top of the beams and spread it with a notched squeegee. There was absolutely no dripping of the epoxy adhesive

Pic 2 First layer of scarfed plywood glued down. Scarfing was necessary to maintain curvature of roof. The underside of the first layer of plywood was coated with two coats of epoxy prior to installation. The second temporary frame at the front of the roof was also necessary to maintain curvature until the second layer of plywood was glued down. The planks make working on the roof easy.
Attached Thumbnails
Click image for larger version

Name:	3.jpg
Views:	71
Size:	76.8 KB
ID:	89451   Click image for larger version

Name:	2.jpg
Views:	65
Size:	69.3 KB
ID:	89452  
__________________

syjos is online now   Reply With Quote
Old 05-29-2019, 04:38 PM   #3
Senior Member
 
w8n4sun's Avatar
 
City: Seattle
Country: USA
Vessel Name: Mabuhay
Vessel Model: Grand Alaskan
Join Date: Jan 2018
Posts: 139
You and Airstream are beasts!!!!!
w8n4sun is online now   Reply With Quote
Old 05-29-2019, 04:41 PM   #4
Guru
 
Airstream345's Avatar
 
City: Seattle, WA USA
Country: United States
Vessel Name: FORTITUDE
Vessel Model: Bluewater 40 Pilothouse
Join Date: Jul 2017
Posts: 597
Syjos is my spirit animal. Talking to him about his projects gave me the confidence to tackle mine.
__________________
FORTITUDE
Blog: mvfortitude.com
Instagram: @mvfortitude
Facebook: Bluewater 40 Owners Group
Airstream345 is offline   Reply With Quote
Old 05-29-2019, 05:05 PM   #5
Guru
 
syjos's Avatar
 
City: Gig Harbor
Country: USA
Vessel Name: Sandpiper
Vessel Model: Bluewater 40 Pilothouse Trawler
Join Date: Nov 2012
Posts: 725
Quote:
Originally Posted by w8n4sun View Post
You and Airstream are beasts!!!!!
I don't know if we are beasts but we gotta do what we gotta do to keep boating.
syjos is online now   Reply With Quote
Old 05-29-2019, 05:09 PM   #6
Guru
 
syjos's Avatar
 
City: Gig Harbor
Country: USA
Vessel Name: Sandpiper
Vessel Model: Bluewater 40 Pilothouse Trawler
Join Date: Nov 2012
Posts: 725
Pic 1. Second layer of 1/2" plywood glued to first layer. Used a notched trowel to spread the adhesive. All seams staggered. This layer of plywood was not scarfed. They were butted at beam. The second layer was clamped down with screws and washers. Screws removed after adhesive cured. The radar mount was scarfed to the new plywood.

Pic 2. Second layer of plywood glued, screw holes filled and sanded. Used System Three Quick Fair epoxy fairing compound to fill holes and fill low spots for the first time. Quick Fair can be cheese grated in 3 to 4 hours and allows multiple applications in one day.

All fasteners were removed after second layer was bonded and cured.. All the overhanging areas had an additional 1/2" plywood glued to the underside for a 1 1/2" thickness. This to eliminate the frames and hollow cavity holding up the overhangs.
Attached Thumbnails
Click image for larger version

Name:	4.jpg
Views:	53
Size:	71.5 KB
ID:	89465   Click image for larger version

Name:	5.jpg
Views:	51
Size:	72.0 KB
ID:	89466  
syjos is online now   Reply With Quote
Old 05-29-2019, 05:23 PM   #7
Guru
 
syjos's Avatar
 
City: Gig Harbor
Country: USA
Vessel Name: Sandpiper
Vessel Model: Bluewater 40 Pilothouse Trawler
Join Date: Nov 2012
Posts: 725
Pic 1. Sanded plywood receiving a coat of epoxy.

Pic 2. After the first coat of epoxy cured, it was sanded and this is the 10 oz fiberglass cloth being applied with a squeegee and rolled with a lamination roller.

The glass cloth is used not for reinforcement but to maintain an even epoxy film thickness. Without the cloth, it would be difficult to maintain an even thickness of epoxy during coating and sanding.

The other reason for the glass cloth is to make the top surface puncture resistant from dropped sharp tools.

The cloth is layed dried and the epoxy squeegeed on and rolled with a laminate roller to press the cloth down. Excess epoxy is squeegeed off to prevent the cloth from floating on the resin. The goal is to end up with a lamination that is not resin rich.
Attached Thumbnails
Click image for larger version

Name:	6.jpg
Views:	49
Size:	86.1 KB
ID:	89468   Click image for larger version

Name:	7.JPG
Views:	50
Size:	174.5 KB
ID:	89469  
syjos is online now   Reply With Quote
Old 05-29-2019, 05:34 PM   #8
Guru
 
syjos's Avatar
 
City: Gig Harbor
Country: USA
Vessel Name: Sandpiper
Vessel Model: Bluewater 40 Pilothouse Trawler
Join Date: Nov 2012
Posts: 725
Pic 1. Fiberglass cloth cured. Edges to be trimmed next. You can see where the roof has been widened. The roof was widened at the sides to offer rain protection over the PH side doors and the front overhang was extended to provide more shade for the PH front windows.

Scarfed in plywood under back window where it was rotted.

Pic 2. Two additional coats of epoxy applied.

I use a notched squeegee to lay thick coats of epoxy to fill the glass cloth weave and to have a sandable build up of resin. I don't sand between coats. I put down two thick layer and sand that. This save at least two days and two coats from not rolling thin layers with a foam roller. And avoid sanding.

I wanted to mention that on this project, I'm using System Three Silver Tip resin. I've been using WEST resin since the 70's and got pretty tired of washing off the blush and sanding between coats. With the Silver Tip resin, there is no blush to wash off and you can recoat within 72 hours without sanding. It also handles better in cold weather and can be used down to 35 degrees F.

Even though I am now using System Three Silver Tip Epoxy instead of WEST epoxy, I use the various WEST fillers when making filets and patching large holes. I still follow all the principles, methods and techniques described in "The Gougeon Brothers on Boat Construction". It is the definitive bible for composite wood boat construction and repairs.
Attached Thumbnails
Click image for larger version

Name:	8.jpg
Views:	47
Size:	68.6 KB
ID:	89470   Click image for larger version

Name:	9.jpg
Views:	47
Size:	77.8 KB
ID:	89471  
syjos is online now   Reply With Quote
Old 05-30-2019, 12:14 PM   #9
Guru
 
syjos's Avatar
 
City: Gig Harbor
Country: USA
Vessel Name: Sandpiper
Vessel Model: Bluewater 40 Pilothouse Trawler
Join Date: Nov 2012
Posts: 725
Glueing down drip edges in preparation for the edge trim
Attached Thumbnails
Click image for larger version

Name:	100_3407.jpg
Views:	45
Size:	108.1 KB
ID:	89496   Click image for larger version

Name:	100_3408.jpg
Views:	43
Size:	71.5 KB
ID:	89497   Click image for larger version

Name:	100_3409.jpg
Views:	45
Size:	102.2 KB
ID:	89498  
syjos is online now   Reply With Quote
Old 05-30-2019, 12:20 PM   #10
Guru
 
syjos's Avatar
 
City: Gig Harbor
Country: USA
Vessel Name: Sandpiper
Vessel Model: Bluewater 40 Pilothouse Trawler
Join Date: Nov 2012
Posts: 725
Pic 1. Edge trim trial fit. Will apply epoxy to the back side of plywood prior to installing. 10 oz glass will be applied to the inside surface of the trim where the pilothouse door slides for abrasion resistance.

The edge trim will be at a slight angle so the roof plywood and drip edge were beveled with a router jig and pattern.

Pic 2. Back piece trial fitted after routing final shape and bevels on top and bottom edges. The roof was more than 8' wide so the trip plywood was scarfed.

Rotted area under window was patched.
Attached Thumbnails
Click image for larger version

Name:	100_3402 (Medium).jpg
Views:	47
Size:	75.7 KB
ID:	89499   Click image for larger version

Name:	100_3403 (Medium).jpg
Views:	44
Size:	73.1 KB
ID:	89500   Click image for larger version

Name:	100_3404 (Medium).jpg
Views:	44
Size:	75.6 KB
ID:	89501   Click image for larger version

Name:	100_3406 (Medium).jpg
Views:	45
Size:	67.1 KB
ID:	89502  
syjos is online now   Reply With Quote
Old 05-30-2019, 12:29 PM   #11
Guru
 
syjos's Avatar
 
City: Gig Harbor
Country: USA
Vessel Name: Sandpiper
Vessel Model: Bluewater 40 Pilothouse Trawler
Join Date: Nov 2012
Posts: 725
We are starting the fun portion of the project now that the old roof has been replaced with a new 1" thick roof.

Pic 1. Laminating the edging for the roof at the front curved corners. I'm using 6 layers of 1/8" Okoume marine plywood. The factory curves were saw cut from a single piece of wood.

Pic 2. Due to the expansion/contraction, water incursion and age, the corners started to crack around 10 years ago. I patched them every year and they would crack in a different place.

Pic 3. 6 layers of 1/8" Okume marine plywood laminated in a single clamp up. Using System Three Gel Magic adhesive which is a huge timesaver. Instead of mixing epoxy and various fillers to make adhesive, Gel Magic is a two part adhesive that doesn't sag.

3. After the corners cure, they will be trimmed and shaped prior to the installation of the rest of the edging. Almost didn't have enough small clamps. Could not use the larger clamps because the weight of the large clamps distorted the curve.
Attached Thumbnails
Click image for larger version

Name:	1 (Medium).jpg
Views:	46
Size:	81.8 KB
ID:	89505   Click image for larger version

Name:	2 (Medium).JPG
Views:	44
Size:	191.6 KB
ID:	89506   Click image for larger version

Name:	3 (Medium).jpg
Views:	42
Size:	68.3 KB
ID:	89507  
syjos is online now   Reply With Quote
Old 05-30-2019, 12:35 PM   #12
Guru
 
syjos's Avatar
 
City: Gig Harbor
Country: USA
Vessel Name: Sandpiper
Vessel Model: Bluewater 40 Pilothouse Trawler
Join Date: Nov 2012
Posts: 725
Pic 1.The previously laminated front corners trimmed and ready to install

Pic 2. Laminated corner glued and rest of roof trim being installed.

The trim on the sides are mounted at a slight angle and the front and back trim are at a greater angle. The beveled curvature at the front and back were done with a router and a pattern. The side bevels with router and straight edge.

3. Roof edge trim being glued on. The total thickness of the roof where the edging attached is 2". Two layer 1/2" plywood roof + 1/2" plywood reinforcement under the overhangs + the 1/2" plywood drip edge. Which is enough surface for the edging to attach.

4. Roof edges almost done. Two small sections to go where the roof narrows towards the back. Next fairing and glassing.
Attached Thumbnails
Click image for larger version

Name:	9 (1) (Medium).jpg
Views:	42
Size:	76.6 KB
ID:	89508   Click image for larger version

Name:	9 (15) (Medium).jpg
Views:	44
Size:	73.5 KB
ID:	89509   Click image for larger version

Name:	9 (25) (Medium).jpg
Views:	43
Size:	66.4 KB
ID:	89510   Click image for larger version

Name:	9 (27) (Medium).jpg
Views:	40
Size:	76.8 KB
ID:	89511  
syjos is online now   Reply With Quote
Old 05-30-2019, 12:49 PM   #13
Guru
 
syjos's Avatar
 
City: Gig Harbor
Country: USA
Vessel Name: Sandpiper
Vessel Model: Bluewater 40 Pilothouse Trawler
Join Date: Nov 2012
Posts: 725
Pic 1. Routing roof trim at joint to add reinforcement. The plywood on either side is the template for routing. Was unable to scarf this joint because of fitment issues.

Pic 2. Glued 1/4" plywood to strengthen the joint. Otherwise the butt joint could show cracks.

Pic. Faired with Quick Fair
Attached Thumbnails
Click image for larger version

Name:	1 (Medium).jpg
Views:	41
Size:	77.0 KB
ID:	89512   Click image for larger version

Name:	2 (Medium).jpg
Views:	37
Size:	62.4 KB
ID:	89513   Click image for larger version

Name:	3 (Medium).jpg
Views:	39
Size:	71.0 KB
ID:	89514  
syjos is online now   Reply With Quote
Old 05-30-2019, 12:59 PM   #14
Guru
 
syjos's Avatar
 
City: Gig Harbor
Country: USA
Vessel Name: Sandpiper
Vessel Model: Bluewater 40 Pilothouse Trawler
Join Date: Nov 2012
Posts: 725
Pic 1. The boats original mast tabernacle was installed at the back edge of the roof making the path between the mast and tender tight. The new roof overhang at the back is 4" shorter than the old roof and by insetting the tabernacle against the back wall, gained 8" of clearance between tender and mast.

The original tabernacle was solid mahogany and freestanding. The new tabernacle is laminated from 1/2" plywood glued to the back wall.

Pic 2. The top of the tabernacle trimmed and faired.
Attached Thumbnails
Click image for larger version

Name:	4 (Medium).jpg
Views:	41
Size:	85.3 KB
ID:	89515   Click image for larger version

Name:	5 (Medium).jpg
Views:	37
Size:	80.9 KB
ID:	89516  
syjos is online now   Reply With Quote
Old 05-30-2019, 01:05 PM   #15
Guru
 
syjos's Avatar
 
City: Gig Harbor
Country: USA
Vessel Name: Sandpiper
Vessel Model: Bluewater 40 Pilothouse Trawler
Join Date: Nov 2012
Posts: 725
Corners fileted.

Edges rounded over in preparation for the glass cloth.
Attached Thumbnails
Click image for larger version

Name:	6 (Medium).jpg
Views:	39
Size:	74.0 KB
ID:	89521   Click image for larger version

Name:	7 (Medium).jpg
Views:	42
Size:	79.0 KB
ID:	89522   Click image for larger version

Name:	100_3466 (Medium).jpg
Views:	41
Size:	95.9 KB
ID:	89524   Click image for larger version

Name:	100_3467 (Medium).jpg
Views:	37
Size:	65.2 KB
ID:	89525   Click image for larger version

Name:	100_3468 (Medium).jpg
Views:	38
Size:	87.9 KB
ID:	89526  

syjos is online now   Reply With Quote
Old 05-30-2019, 01:13 PM   #16
Guru
 
syjos's Avatar
 
City: Gig Harbor
Country: USA
Vessel Name: Sandpiper
Vessel Model: Bluewater 40 Pilothouse Trawler
Join Date: Nov 2012
Posts: 725
Applied 10 oz fiberglass cloth to the pilothouse roof trim, folding it over the drip edge. Next, trimming the cloth, applying more epoxy, sanding, fairing, more sanding and paint!!!

I used a foam roller to apply the epoxy. Not able to squeegee the epoxy on vertical surface. Applied 4 or 5 coats to get fill the weaves. Did add some silica to reduce sag.
Attached Thumbnails
Click image for larger version

Name:	100_3492 (Medium).jpg
Views:	37
Size:	72.5 KB
ID:	89527   Click image for larger version

Name:	100_3493 (Medium).jpg
Views:	38
Size:	82.8 KB
ID:	89528   Click image for larger version

Name:	100_3494 (Medium).jpg
Views:	38
Size:	82.0 KB
ID:	89529  
syjos is online now   Reply With Quote
Old 05-30-2019, 01:18 PM   #17
Guru
 
syjos's Avatar
 
City: Gig Harbor
Country: USA
Vessel Name: Sandpiper
Vessel Model: Bluewater 40 Pilothouse Trawler
Join Date: Nov 2012
Posts: 725
Here is a detail that took me all day to figure out and actually do.

The two 16" VHF antennas were previously located on the exterior face of the roof trim. It is located at a narrow place on the boat deck and the mount for the antenna would snag clothing as we walked by. Eliminating the upper mount, recessing the antenna and using a different method to hold the antenna in the recess should eliminate that problem.

Pic 1. Drilling a 1 1/2" hole for recessed VHF antenna mount using a jig. The angles were what took the longest to figure out.

Fiberglass cloth has been trimmed.

Pic 2. The drip edge trim around the hole was installed before drilling the hole.

Pic 3 & 4. Test fitting the antenna recesses. One on each side.

I'll have to have the bottom antenna mount machined to shorten it's reach to match the new upper mount location.
Attached Thumbnails
Click image for larger version

Name:	100_3495 (Medium).jpg
Views:	35
Size:	83.5 KB
ID:	89532   Click image for larger version

Name:	100_3497 (Medium).jpg
Views:	40
Size:	89.6 KB
ID:	89533   Click image for larger version

Name:	100_3498 (Medium).jpg
Views:	36
Size:	69.0 KB
ID:	89534   Click image for larger version

Name:	100_3499 (Medium).jpg
Views:	39
Size:	79.1 KB
ID:	89535  
syjos is online now   Reply With Quote
Old 05-31-2019, 12:04 PM   #18
Guru
 
syjos's Avatar
 
City: Gig Harbor
Country: USA
Vessel Name: Sandpiper
Vessel Model: Bluewater 40 Pilothouse Trawler
Join Date: Nov 2012
Posts: 725
Stopped working on the roof before Memorial Day Weekend 2018 to go on a YC Cruise and after that get ready for the summer cruise.

Made sure all the new roof components were coated with at least two coats of white pigmented epoxy to keep UV degradation of the epoxy coating to a minimum and to keep the interior of the boat cooler. Put all the antennas and other roof equipment back on.

The new roof with the deeper overhangs really changes the look of the boat. The overhangs provides shade from the sun and keeps rain out of the open pilothouse doors.

Last picture was taken before new PH roof.
Attached Thumbnails
Click image for larger version

Name:	100_3520 (Medium).jpg
Views:	36
Size:	70.5 KB
ID:	89573   Click image for larger version

Name:	100_3525 (Medium).JPG
Views:	42
Size:	168.8 KB
ID:	89574   Click image for larger version

Name:	IMG_2546.jpg
Views:	38
Size:	153.6 KB
ID:	89576  
syjos is online now   Reply With Quote
Old 06-03-2019, 12:27 PM   #19
Guru
 
syjos's Avatar
 
City: Gig Harbor
Country: USA
Vessel Name: Sandpiper
Vessel Model: Bluewater 40 Pilothouse Trawler
Join Date: Nov 2012
Posts: 725
Here are some details I forgot to post.

Pic 1, 2. After the fiberglass cloth was applied to the trim and folded over the drip edge, the inside corner was filleted with Quickfair, before final coating with pigmented epoxy.

Pic 3, 4. Copper tubing flared for roof drainage.

Pic 5, 6. Hole drilled through roof, chamfered and copper tubing epoxied in the hole.

Pic 7, 8, 8. Tubing and hoses to drain water away from boat.

On the pilothouse roof there are 4 roof drains
Attached Thumbnails
Click image for larger version

Name:	100_3503 (Medium).JPG
Views:	35
Size:	178.1 KB
ID:	89707   Click image for larger version

Name:	100_3504 (Medium).JPG
Views:	33
Size:	187.0 KB
ID:	89708   Click image for larger version

Name:	100_3506 (Medium).JPG
Views:	30
Size:	164.6 KB
ID:	89709   Click image for larger version

Name:	100_3509 (Medium).JPG
Views:	34
Size:	163.3 KB
ID:	89710   Click image for larger version

Name:	100_3510 (Medium).JPG
Views:	34
Size:	175.3 KB
ID:	89711  

Click image for larger version

Name:	100_3511 (Medium).JPG
Views:	30
Size:	181.8 KB
ID:	89712   Click image for larger version

Name:	100_3515 (Medium).JPG
Views:	30
Size:	154.6 KB
ID:	89713   Click image for larger version

Name:	100_3517 (Medium).JPG
Views:	30
Size:	183.3 KB
ID:	89714   Click image for larger version

Name:	100_3518 (Medium).jpg
Views:	32
Size:	78.9 KB
ID:	89715  
syjos is online now   Reply With Quote
Old 06-03-2019, 04:37 PM   #20
Guru
 
Airstream345's Avatar
 
City: Seattle, WA USA
Country: United States
Vessel Name: FORTITUDE
Vessel Model: Bluewater 40 Pilothouse
Join Date: Jul 2017
Posts: 597
What size copper tubing did you use? Getting ready to add four to our boat deck next weekend.
__________________

__________________
FORTITUDE
Blog: mvfortitude.com
Instagram: @mvfortitude
Facebook: Bluewater 40 Owners Group
Airstream345 is offline   Reply With Quote
Reply

Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off





All times are GMT -5. The time now is 09:35 PM.


Powered by vBulletin® Version 3.8.8 Beta 4
Copyright ©2000 - 2019, vBulletin Solutions, Inc.
Search Engine Optimization by vBSEO 3.6.0
Copyright 2006 - 2012
×