In our Hurricane Hole location we still try to relieve the dock loads in season.

This is done by using "pins" ,,6 or 7 ft long 8 inch piling cut offs located on shore about 20-30 ft from the water edge.

These are dug in till only about a foot is visible.

By securing to the pins fore and aft , and crossing extra lines much of the gust loading can be absorbed.

Old anchor line is used as many line lengths are boat long , plus the land poerton.

About 4 100ft lines are the norm , heavy being better for less initial stretch.
__________________
Advertisement

FF is offline   Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off





All times are GMT -5. The time now is 10:22 AM.


Powered by vBulletin® Version 3.8.8 Beta 4
Copyright ©2000 - 2017, vBulletin Solutions, Inc.
Search Engine Optimization by vBSEO 3.6.0
Copyright 2006 - 2012