jimL
Senior Member
- Joined
- Mar 8, 2015
- Messages
- 358
- Location
- USA
- Vessel Name
- Lemon Drops
- Vessel Make
- 2001 Grand Banks Europa 52
Hi,
We have a new to us 2005 Mainship 430 Aft cabin trawler and would like some work completed upon haul out. Where we’re located we don’t have access to the many skilled contractors that we need. We’re looking at marina’s along the south shore of CT or north shore of LI Sound to store the boat over the winter and have the work completed.
We are looking for recommendations to have these services completed upon haul out or prior to spring commissioning:
1. The gel coat rubbed out, glazed and waxed below the rub rail.
2. Rebuild the swim platform which will include taking it off the boat, re-building it and a re-install.
3. Apply an Awlgrip type epoxy/paint to all non-skid surfaces of the boat to include the swim platform.
4. Replacement of some hoses in the engine room
This boat has been well maintained mechanically, but the non-skid surfaces in some areas are beyond cleaning or buffing – we’ve tried everything.
Thanks,
JimL
We have a new to us 2005 Mainship 430 Aft cabin trawler and would like some work completed upon haul out. Where we’re located we don’t have access to the many skilled contractors that we need. We’re looking at marina’s along the south shore of CT or north shore of LI Sound to store the boat over the winter and have the work completed.
We are looking for recommendations to have these services completed upon haul out or prior to spring commissioning:
1. The gel coat rubbed out, glazed and waxed below the rub rail.
2. Rebuild the swim platform which will include taking it off the boat, re-building it and a re-install.
3. Apply an Awlgrip type epoxy/paint to all non-skid surfaces of the boat to include the swim platform.
4. Replacement of some hoses in the engine room
This boat has been well maintained mechanically, but the non-skid surfaces in some areas are beyond cleaning or buffing – we’ve tried everything.
Thanks,
JimL