dhmeissner
Guru
- Joined
- Sep 26, 2012
- Messages
- 1,569
- Location
- North America
- Vessel Name
- The Promise
- Vessel Make
- Roughwater 35
I thought the hull refit was complete, but lurking aft was this...
Rudder packing gland Swiss cheese. So out comes the shaft and new parts ordered. That will be every piece of bronze ( through hulls & seacocks) replaced in the hull. With the new shaft log and drip less shaft seal, will have a very dry bilge indeed.
Rudder packing gland Swiss cheese. So out comes the shaft and new parts ordered. That will be every piece of bronze ( through hulls & seacocks) replaced in the hull. With the new shaft log and drip less shaft seal, will have a very dry bilge indeed.