Thread Tools Display Modes
Old 01-13-2014, 09:28 AM   #1
Senior Member
Bilgewater's Avatar
City: New Bern, N.C.
Country: USA
Join Date: Jun 2011
Posts: 256
Small winter project

Finished up a small project while aboard for the week end on the hard, charging the batteries. Made an insert to convert to fore peak into a master rompatorium . Cushion fabrication courtesy of the Admiral. Also becomes a work bench with vice with the cushions stowed. A pair of barrel bolts on the bottom side locks the main piece in place. After removing the vice, the main piece hangs on a bulkhead out of the way under the foul weather gear. Too cold to do any engine work, have to wait for warmer weather. Come on, Spring!
Attached Thumbnails
Click image for larger version

Name:	IMG_0576[1].jpg
Views:	56
Size:	81.9 KB
ID:	26635   Click image for larger version

Name:	IMG_0574[1].jpg
Views:	61
Size:	68.2 KB
ID:	26636   Click image for larger version

Name:	IMG_0575[1].jpg
Views:	56
Size:	103.1 KB
ID:	26637   Click image for larger version

Name:	IMG_0573[1].jpg
Views:	58
Size:	72.3 KB
ID:	26638  
"Keep putting off till tomorrow, and you'll end up with a lot of empty yesterdays" Prof. Harold Hill
Bilgewater is offline   Reply With Quote

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off

All times are GMT -5. The time now is 04:30 PM.

Powered by vBulletin® Version 3.8.8 Beta 4
Copyright ©2000 - 2016, vBulletin Solutions, Inc.
Search Engine Optimization by vBSEO 3.6.0
Copyright 2006 - 2012