Penta
Senior Member
- Joined
- Dec 2, 2007
- Messages
- 118
- Location
- Canada
- Vessel Name
- Penta
- Vessel Make
- 36' 1961 Sather ex-Gill Netter
Have any of you had any success combining thru-hulls for the likes of a head sink and a bilge pump? I want to reduce the number of holes/thru-hulls I have to install and am considering the plan of combining as stated with the sink feeding down into the "T" and then the bilge pump line having a slight down-hill run to the "T" so that the water would drain "down hill" from both sources. The pump is a small 1500 gal/hr unit and the "T" would be right before the thru-hull valve so there should be no back pressure.
Any thoughts of wisdom out there?
Thanks Guys
John
Penta
Sidney, BC
Any thoughts of wisdom out there?
Thanks Guys
John
Penta
Sidney, BC