Progress Report July 21st

Scott forwarded a new batch of photo's a few days ago which were taken last week so these are a little dated. That aside we can see significant progress in just one week. This photo of the bow shows the new larger rub rail and new bow railing installed. When we first looked at the bow railing on the H38 we were impressed with its size and quality, no need to change anything (at least that was what I thought). Then I started to think about previous boats we have owned and those that offered a bow railing which extends over the anchor allowing me to safely lean over during the retrieval process. I spoke to Scott about this enhancement and he agreed it would be an improvement. In addition to the safety concern I also like the appearance it offers of a longer or slightly sleeker bow. We can also see the hull stripe has been applied. More to follow.............

We off to SD (again) to escape the heat and will provide more photos and updates once we get settled in.

John
Attached Thumbnails
Click image for larger version

Name:	Bow July 25.jpg
Views:	51
Size:	53.1 KB
ID:	54624  
__________________
Advertisement

N4061 is offline   Reply With Quote
Old 07-30-2016, 10:43 PM   #542
Guru
 
Join Date: Feb 2010
Posts: 572
Progress Report

After a few days in SD which included a stop at the marina to obtain our parking and gate pass keys, we are back home and able to share a few photo's. We can see continued progress with the galley and center cabinet just to port from the steps leading up to the pilothouse. Some of the changes we made to the cabinet included raising the microwave allowing for about 18" of clearance below for a coffee maker or what ever Mary decides to place there. We also decided to go with a fully encased microwave cabinet resulting in a slightly smaller unit but still large enough for our use.

We can see the SS sink has been installed to port and aft near the sliding the door entrance. To port we can also see how the stove / oven will be slightly recessed from the counter left and refrigerator to right. At first we were concerned the refrigerator / freezer would block entrance to the day head (port side) but after taking measurements aboard another boat I was able to confirm there is plenty of pass through space.

Looking at the ceiling we can see the finishing coats have been applied providing a very nice finish which we never see once the ceiling panels are installed after all the wiring is complete.

OK, gotta go now. Mary recorded Jimmy Buffet for me when he appeared on the Today Show last Friday and I'm curious to see what he has to say.

Scott leaves tomorrow for China, more to follow.
Attached Thumbnails
Click image for larger version

Name:	Galley July 25th.jpg
Views:	65
Size:	46.9 KB
ID:	54742  
__________________

N4061 is offline   Reply With Quote
Old 07-31-2016, 01:12 AM   #543
Guru
 
MYTraveler's Avatar
 
City: West Coast
Country: USA
Join Date: Apr 2014
Posts: 652
Very exciting!
MYTraveler is offline   Reply With Quote
Old 07-31-2016, 01:13 AM   #544
Guru
 
BandB's Avatar
 
City: Fort Lauderdale
Country: USA
Join Date: Jan 2014
Posts: 8,556
Quote:
Originally Posted by MYTraveler View Post
Very exciting!
Very, although I must admit I'm not good at visualizing from partially complete boats or homes or remodels. I can visualize it on paper and drawings before, but the in process just throws me.
BandB is online now   Reply With Quote
Old 07-31-2016, 11:44 AM   #545
Guru
 
Join Date: Feb 2010
Posts: 572
Progress Report

A couple of photos showing the OSR head and shower. The first photo is the of the shower room to starboard with a separate opening window. The second photo is the head compartment (port side) also with separate opening window. Since both compartments were previous built outside the boat there is not a lot to do after glassing them except to add pluming and finishing touches. Having separate shower / head rooms is a first for us on a boat and something we look forward to. While the shower is a little on the narrow side we have had smaller so we believe it will work out fine.
Attached Thumbnails
Click image for larger version

Name:	Shower July 25.jpg
Views:	47
Size:	39.7 KB
ID:	54758  
Attached Images
 
N4061 is offline   Reply With Quote
Old 07-31-2016, 12:13 PM   #546
Guru
 
Join Date: Feb 2010
Posts: 572
Pilothouse Photo

We can see progress being made in the PH including completion of port side seating area. Another nice touch the builder recently added is a head rest against the aft bulkhead. While some people may not notice this enhancement we appreciate the forward thinking of Scott and the builder to provide an added level of safety during rough seas.

The seating area is large enough for three people and the fixed table (to be installed) will provide a nice dinning area which we plan to use often while enjoying the views.

We can also see to port the large and deep map storage compartment which will be covered with a hinged panel.

Things are looking good!
Attached Thumbnails
Click image for larger version

Name:	PH July 25th.jpg
Views:	47
Size:	36.7 KB
ID:	54759  
N4061 is offline   Reply With Quote
Old 07-31-2016, 02:28 PM   #547
Veteran Member
 
City: FT.Pierce, Fl
Country: US
Vessel Name: Tuna Talk
Vessel Model: CC Tournament 30
Join Date: Jul 2015
Posts: 68
John -

your redesigned salon looks expansive...nice job!
Jim Cooper is offline   Reply With Quote
Old 07-31-2016, 02:34 PM   #548
Senior Member
 
danderer's Avatar
 
City: Newark, DE
Country: US
Vessel Model: 2006 Mainship 34T
Join Date: Jan 2015
Posts: 121
How do you feel about the overall rate of progress here? Has it met your expectations?

IIRC, the initial estimate was a 6-month "build time". I'm guessing you'll now be close to a year between order and delivery.
danderer is offline   Reply With Quote
Old 07-31-2016, 04:26 PM   #549
Guru
 
Join Date: Feb 2010
Posts: 572
Schedule Expectations

Quote:
Originally Posted by danderer View Post
How do you feel about the overall rate of progress here? Has it met your expectations?

IIRC, the initial estimate was a 6-month "build time". I'm guessing you'll now be close to a year between order and delivery.
Excellent question and something Mary (my wife) has also been asking. We signed the contract in early November 2015. Figure about one month to process and obtain materials plus six months six months we were looking at May 2016 completion. Now we are looking at shipping on or about August 20th. So we are about three months longer than originally planned.

When Scott and I looked back at why the delay we both concluded we underestimated a few things with the most significant being the redesigned and all new deck tooling and PH roof. Even though some this started late last year it all takes times. Add in the Chinese New Year (we should have included originally) which equals about one lost month and it all adds up. While Mary and I didn't help with a number of in "process changes" none of them impacted the overall schedule.

So, what would Scott quote and likely deliver against on the following boats? I believe it back to six - seven months. Being the first buyer of any new boat or major redesigned boat is not for the "beginner" who likely would expect everything to be perfect. Trawler style boats with their level of customization and complexity just don't work that way.

As long as the quality and all our other expectations are met we will be fine with a small delay. We recognize based on past experiences that within a few weeks off enjoying the boat we will have forgotten we had to wait a little longer than originally planned. Another plus for us in southern California is that our best boating weather is the fall with clear skies and calmer seas so an early September start of boating for us is perfect.

John
N4061 is offline   Reply With Quote
Old 07-31-2016, 06:22 PM   #550
Guru
 
twistedtree's Avatar
 
City: Gloucester, MA
Country: USA
Join Date: Jan 2013
Posts: 2,150
It's real hard to tell how far along things really are with so few pictures, but it appears that electrical work has only just begun, and that plumbing has not yet started. I assume the engine/gear drive line, rudder etc are all done, but maybe not. Also still lots of equipment to install including electrical, steering system, plumbing systems, fuel and water fills and vents, drains, bilge pumps, alarms, throttle and engine controls, horn, lights, etc. It also looks like doors, windows, and port lights/hatches are still to be installed. Presumably all this equipment is on the container that shipped about 2 weeks ago and should be arriving mid Aug.

I'll go out on a limb at take a crack at a remaining time table:

- 6-8 weeks of build time left. And this might be more like 8-10.

- 4-6 weeks shipping. The actual ocean crossing may only be 2 weeks, but the ship is almost never available right when you are ready so you end up waiting. Then after loading the ship will typically roam around Asia for a while picking up other freight, then cross over.

- 2 weeks commissioning for Scott to finish up whatever he needs to do, fully test, and fix any issues.

- 4 weeks for electronics. As I recall you are not pre-installing anything? This might take a little less time if you are doing a minimal system, but I'm assuming 1-2 MFDs, a thruhull transducer with fairing, radar, VHF, GPS antenna, heading sensor, Autopilot. Presumably there will also be some amount of AV equipment like a TV and maybe a sound system.

- 2-3 weeks for soft goods. Window shades, curtains, carpet, pillows, bed covers all take time, and some of it requires templating, fabrication, and fitting.

- 2 weeks for other outfitting. Will you have a dinghy? And if so, it will need mounts of some sort. Safety gear above and beyond the minimum, tools, basic spares, charts, binocs and all your own nav accessories, etc. Half out boat seems to be filled with this sort of stuff.

Now some of the state-side work can happen in parallel, but I expect total elapsed time will be 4-6 weeks. I think bottom line you are still looking at 14-18 weeks until you take ownership and sail off into the sunset. But that said, I think your attitude is right - take what time is needed to get the boat you want - then go enjoy it. Any delays will quickly be supplanted by great cruising.
__________________
www.MVTanglewood.com
twistedtree is online now   Reply With Quote
Old 07-31-2016, 06:58 PM   #551
Guru
 
Join Date: Feb 2010
Posts: 572
Time to finish

[QUOTE=twistedtree;465294]It's real hard to tell how far along things really are with so few pictures, but it appears that electrical work has only just begun, and that plumbing has not yet started. I assume the engine/gear drive line, rudder etc are all done, but maybe not. Also still lots of equipment to install including electrical, steering system, plumbing systems, fuel and water fills and vents, drains, bilge pumps, alarms, throttle and engine controls, horn, lights, etc. It also looks like doors, windows, and port lights/hatches are still to be installed. Presumably all this equipment is on the container that shipped about 2 weeks ago and should be arriving mid Aug.

Wow, good to see someone with a little experience comment. While all your comments and remaining work are accurate there are a few things to note which make me optimistic that we are not that far away.

First is that the photos are now two weeks old and the electrical we have been told has in fact commenced. The equipment shipped two weeks ago is scheduled to arrive the yard by 8/7 and is limited in content. Scott has already started to book the first freighter based on a August 20th completion at the yard. His visit this week will confirm the boat will be ready.

Regarding post arrival tasks I think the estimates you provided are based more on Nordhavn style boats and time tables. I can attest that commissioning on our two N40's were four and six weeks. The longer schedule included electronics and soft goods installation towards the end. Commissioning on these boats is much simpler and only takes a few days, add in two days for training and sea trials and we are talking one week.

We plan to have Alcom Marine perform the electronics installation and based upon our work package the estimate is five working days. This will start a couple of weeks after the boat is turned over to us so we can enjoy some time "out on the bay" and evenings aboard at the marina.

Soft goods (interior and exterior) will get started as soon as the boat is handed over and will only take about two weeks from order to installation.

Bottom line (assuming all goes as planned) is that we should have the boat ready for our first coastal run off shore within about one month after delivery. Again, if it takes a little longer that is OK since we really just want to be able to get on the boat and start relaxing at the marina where the weather is cooler and the Margaritas are plentiful.

Our approach to any new boat (new to us) is to take things slow and expand our day trips little by little until we feel 100% confident with the boat, its systems and ourselves. We are not on a clock and want to enjoy every minute learning the boat.

Now if I'm talking about this part of the build process again in December then we may be little disappointed (hope not).

John
N4061 is offline   Reply With Quote
Old 07-31-2016, 07:45 PM   #552
Guru
 
twistedtree's Avatar
 
City: Gloucester, MA
Country: USA
Join Date: Jan 2013
Posts: 2,150
One difference I see right away is that you will take ownership as soon as Scott has completed the boat checkout, then install electronics, soft goods, etc afterwards. Your estimate of 4 weeks for all that is about the same as my 4-6 estimate. The only difference is that the boat becomes yours earlier in the process, which is a perfectly reasonable way to do it.

But I will definitely be surprised if the boat is ready to ship in 3 weeks, i.e. on Aug 20th. I hope I'm wrong.

For electronics, will the boat need to be hauled to install a transducer?
__________________
www.MVTanglewood.com
twistedtree is online now   Reply With Quote
Old 08-01-2016, 12:12 AM   #553
Guru
 
BandB's Avatar
 
City: Fort Lauderdale
Country: USA
Join Date: Jan 2014
Posts: 8,556
Quote:
Originally Posted by twistedtree View Post
One difference I see right away is that you will take ownership as soon as Scott has completed the boat checkout, then install electronics, soft goods, etc afterwards. Your estimate of 4 weeks for all that is about the same as my 4-6 estimate. The only difference is that the boat becomes yours earlier in the process, which is a perfectly reasonable way to do it.

But I will definitely be surprised if the boat is ready to ship in 3 weeks, i.e. on Aug 20th. I hope I'm wrong.

For electronics, will the boat need to be hauled to install a transducer?
I would be shocked if it shipped in August. Hope I'm wrong as well.

I can't imagine building as your build went but it worked for you and Scott. I'm just use to specifications up front and very few and only minimal changes along the way. This was a design while building project. What counts though is if you both end up happy, if you're happy with the boat and they are happy with the payment in light of the various changes and delays, then the world is all good. That's all that matters.
BandB is online now   Reply With Quote
Old 08-01-2016, 09:47 AM   #554
Member
 
City: Crofton, MD
Country: USA
Vessel Name: Able Explorer
Vessel Model: Nimble Nomad
Join Date: Mar 2016
Posts: 5
Congratulations ! We're in the process of deciding on a live-aboard and anxious to hear about your decision process. We saw the Helmsman 38 at the Bay Bridge boat show this Spring and it was the show favorite for us as were the company folks w talked to.
SteveJan is offline   Reply With Quote
Old 08-02-2016, 11:07 PM   #555
Guru
 
Join Date: Feb 2010
Posts: 572
Helmsman

Quote:
Originally Posted by SteveJan View Post
Congratulations ! We're in the process of deciding on a live-aboard and anxious to hear about your decision process. We saw the Helmsman 38 at the Bay Bridge boat show this Spring and it was the show favorite for us as were the company folks w talked to.
Steve / Jan, we put a lot of research and thought into our decision and the H38E and would enjoy discussing our decision process with you. We would welcome the opportunity to discuss this over the phone one evening if you are interested. Best of luck with your next boat!

John T.
N4061 is offline   Reply With Quote
Old 08-07-2016, 08:19 PM   #556
Guru
 
Join Date: Feb 2010
Posts: 572
Progress Report August 2nd

This past week we received an update from Scott who was at the yard inspecting our boat along with many others which will follow. Scott reported he was very pleased with the way everything was turning out and impressed with the openness of the salon / galley. He also liked the way the bow railing turned out and will consider making it standard on future boats. He said the yard is holding firm on a August 20th completion date so he proceeded with booking the freighter.

A few new photos show the boat has been moved to the final staging area for completion and the black bottom paint has been applied. The hull has the protective blue paper which will be removed prior to shrink wrapping the boat for shipping. In the second photo we can see the recently added drop down TV cabinet to port and an electrical termination panel forward.

So far so good!

John
Attached Thumbnails
Click image for larger version

Name:	Boe Aug 1.jpg
Views:	44
Size:	54.3 KB
ID:	55020   Click image for larger version

Name:	TV Drop Down Aug 1.jpg
Views:	42
Size:	41.3 KB
ID:	55021  
N4061 is offline   Reply With Quote
Old 08-07-2016, 08:22 PM   #557
Guru
 
menzies's Avatar
 
City: Jacksonville
Country: USA
Vessel Name: SONAS
Vessel Model: Grand Alaskan 53
Join Date: May 2014
Posts: 1,308
Question: are you actually going to cruise this vessel - or flip it?
menzies is offline   Reply With Quote
Old 08-07-2016, 08:39 PM   #558
Guru
 
Join Date: Feb 2010
Posts: 572
Progress Report August 2nd

In this photo we can see progress with the flybridge (FB) and just how large it will be for a 38'. Of course we are comparing the PB to the small two seat FB we had on our N40's. I believe the N40 FB was a second thought and limited to the small area above the PH due to the boats design.

With the H38E FB we have room for two pedestal seats (center and starboard) and a nice L-shaped seating area to port with a small fixed table. There is nice storage under the forward console which is always valuable. Since this boat has the low profile PH the FB is also low profile providing everything a FB offers but without the added windage. Behind all this is plenty of room for the 9' dingy and davit.

John
Attached Thumbnails
Click image for larger version

Name:	Aug 2nd Fly Bridge.jpg
Views:	41
Size:	43.9 KB
ID:	55023  
N4061 is offline   Reply With Quote
Old 08-07-2016, 08:55 PM   #559
Guru
 
Join Date: Feb 2010
Posts: 572
Ownership

Quote:
Originally Posted by menzies View Post
Question: are you actually going to cruise this vessel - or flip it?
Wow, interesting question. While we have enjoyed a few different trawlers over the past ten years and enjoy the build process we have never "flipped" a boat and have no plans in letting this one go any time soon. We put a lot of research and planning into this build and plan to use the boat on the west coast a few years before shipping her to the east coast and exploring the ICW. All this being said we recognize nothing in life is guaranteed thus we do not set any plans in stone.

John
N4061 is offline   Reply With Quote
Old 08-07-2016, 09:12 PM   #560
Ted
Senior Member
 
Ted's Avatar
 
City: Campbell River
Country: Canada
Vessel Name: Okisollo
Join Date: Apr 2012
Posts: 474
If I'm not mistaken, looking at the pictures, the bridge controls are at the aft end of the
pilot house. Wouldn't that be called "bridge deck controls"?
I thought a flying bridge mounted over the fore end of the pilot house.
My Oxford Maritime Dictionary(?) is still packed from our move.

Ted
__________________

Ted is offline   Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off





All times are GMT -5. The time now is 05:02 PM.


Powered by vBulletin® Version 3.8.8 Beta 4
Copyright ©2000 - 2016, vBulletin Solutions, Inc.
Search Engine Optimization by vBSEO 3.6.0
Copyright 2006 - 2012